Elmira Water Board

Elmira Water BoardElmira Water BoardElmira Water Board
  • pay your bill
  • contact us
  • Service Line Information
  • about ewb
  • Job Openings
  • Bids
    • 2025 Annual Bids
    • Public Work Registry
    • RFQ for Engineering Svcs
  • Rates & Fees
    • Water Rates
    • Fire Protection Rates
    • Customer Fees
    • Billing Dates & Map
  • Reports
    • 2024 Annual Water Quality
    • Recent Analytical Results
    • 2024 Annual Report
  • FAQ's
    • Why Don't I Have Water?
    • Billing & Collection FAQs
    • General Questions
    • Frozen Meter FAQ's
    • Water Conservation
    • Upgraded Meter Project
  • Additional Info
    • Board Meeting Schedule
    • FOIL Requests
  • Backflow Prevention
  • About
  • More
    • pay your bill
    • contact us
    • Service Line Information
    • about ewb
    • Job Openings
    • Bids
      • 2025 Annual Bids
      • Public Work Registry
      • RFQ for Engineering Svcs
    • Rates & Fees
      • Water Rates
      • Fire Protection Rates
      • Customer Fees
      • Billing Dates & Map
    • Reports
      • 2024 Annual Water Quality
      • Recent Analytical Results
      • 2024 Annual Report
    • FAQ's
      • Why Don't I Have Water?
      • Billing & Collection FAQs
      • General Questions
      • Frozen Meter FAQ's
      • Water Conservation
      • Upgraded Meter Project
    • Additional Info
      • Board Meeting Schedule
      • FOIL Requests
    • Backflow Prevention
    • About

Elmira Water Board

Elmira Water BoardElmira Water BoardElmira Water Board
  • pay your bill
  • contact us
  • Service Line Information
  • about ewb
  • Job Openings
  • Bids
    • 2025 Annual Bids
    • Public Work Registry
    • RFQ for Engineering Svcs
  • Rates & Fees
    • Water Rates
    • Fire Protection Rates
    • Customer Fees
    • Billing Dates & Map
  • Reports
    • 2024 Annual Water Quality
    • Recent Analytical Results
    • 2024 Annual Report
  • FAQ's
    • Why Don't I Have Water?
    • Billing & Collection FAQs
    • General Questions
    • Frozen Meter FAQ's
    • Water Conservation
    • Upgraded Meter Project
  • Additional Info
    • Board Meeting Schedule
    • FOIL Requests
  • Backflow Prevention
  • About

Schedule of Customer Fees

Interruption Notice Fee

$10.00

Interruption of Service Fee

$75.00

Special Meter Read/ Final Read

$20.00

Returned Check Fee

$20.00

Meter Removal Fee

$75.00

Meter Reset (due to customer action - Meter 1" or less)

$75.00

Meter Reset (Larger than 1")

Time & Materials & Cost of Meter

Meter Test Fee (1" and smaller)

$40.00

Meter Test Fee (Larger than 1")

Time & Materials

New Meter Installation (1" or less)

$150.00

New Meter Installation (greater than 1")

see note below

Billed at time and materials plus the cost of the meter

Replace Frozen/Damaged/Missing Radio

$150.00

Replace Frozen/Damaged/Missing Meter (1" or less)

$150.00

Replace Frozen/Damaged Meter (meter over 1")

see note below

Billed at time and materials plus the cost of the meter 

Non-Emergency Call-Outs (after hours)

see note below

Billed at time and materials, with a minimum of $125.00

Hydrant Permit

$250.00 / week

**note there is also a $1,000.00 refundable deposit required**

New Service Line 3/4" or 1" (main to curb)

$1,200.00

A $600.00 deposit is required prior to installation

Construction Service Rate

$235.00 / hour

Includes: Working Supervisor, Crew, Backhoe & Dump Truck

Tenant Occupied Property -Owner Requested Shut-Off

$300.00

payable at the time of request and non-refundable

Past-due Backflow Preventer Inspection

$100.00

per every 2 weeks it is past due 

Meter PIT Pumping Fee

Time & Materials

Minimum $50

Opt out of Advanced Metering Infrastructure (AMI) Smart Meter (Radio)

Per Billing Cycle Fee

$20 for bi-monthly accounts and $10 for monthly accounts


Copyright © 2022 Elmira Water Board - All Rights Reserved.

Powered by