Billed at time and materials plus the cost of the meter
Billed at time and materials plus the cost of the meter
Billed at time and materials, with a minimum of $125.00
**note there is also a $1,000.00 refundable deposit required**
A $600.00 deposit is required prior to installation
Includes: Working Supervisor, Crew, Backhoe & Dump Truck
payable at the time of request and non-refundable
every 2 weeks it is past due
Copyright © 2022 Elmira Water Board - All Rights Reserved.